The summer house Diaries

I dug a hole 400mm deep and positioned Just about every write-up into it. The post was secured in position using a bag of premixed concrete bad that just needed water introducing to it and no mixing and sets in just half an hour. I took care to be sure Each and every submit was buried the identical depth, vertically degree and square with one anoth

read more